Balanced Lift Method

This new bridge construction method consists in building the bridge girders in a vertical position and in rotating the bridge girders into the final horizontal position. In some topographical situations it will be more efficient to produce bridge girders with this innovative method than with the traditional incremental launching method or the balanced cantilever method.

The span of the bridge girders is reduced by the compression struts which enables considerable savings in construction materials. The proposed method will be especially advantageous for bridges with high piers and span length between 50 m and 250 m.

 

Fig. 1: Bridges with high piers

The usage of a temporary pier enables the expedient application of the balanced lift method for bridges with piers of modest height (Fig. 2). The temporary pier can additionally be used for auxiliary cables during the subsequent construction phases, as is shown for the bridge over the Lafnitz river in the paper "DateidownloadBuilding bridges using the balanced lift method". 

Fig. 2: Bridges with low piers

The following patents have been granted for the balanced lift method:

GermanyDE 102006039551, 20.09.2007
USAUS 7 996 944, 16.08.2011
RussiaRU 2436890, 20.12.2011
CanadaCA 2661311, 20.11.2012
ChinaCN 101535571, 29.05.2013
AustraliaAU 2007288151, 30.05.2013
JapanJP 5302195, 28.06.2013

The European patent will be granted in April 2016. The patents in Norway and India are still pending.

Several field tests have been carried out to further investigate and improve structural details of this new bridge construction method in order to show the feasibility and the easy practical application (see Fig. 3).

Fig. 3: Lifting process during the field test in Gars am Kamp